← Back to The HUT

September 1976 · Volume/issue not printed or unknown

September 1976 Magazine

Issue first-page cover

Magazine · 8 pages

September 1976 Magazine

Captured text — scan page 6

Automatically captured text may contain recognition errors. Compare it with the original scan.

An innovation | approve of is the under 3 inches so it will be your boat out of the mold. You

addition of a combination pillar- covered by the final layer of needn’t do this; simply seam
footrest made of ethafoam in the tape. It’s important to let the your boat as usual, and after
bow of a kayak. This supports freshly-seamed side sit for at popping it, drill a hole at the end
the deck and provides the safest least two hours before turning of the groove, run a wire through
possible foot support. The disad- the boat to do the other side. Be the hole and back to the seat
vantage is that it creates a sure the resin is sufficiently set area, attach the grab loop to the
severe flexibility differential— up and will not drain from the wire, and pull it back through
the boat is extremely rigid where seam area when the boat is the hole. The knot on the grab
the pillar is in contact with the turned. Waiting until the first loop will hold it inside. Then
hull and deck. The added safety side has begun to gel can cause simply cover the knot with the
probably more than compen- another problem, as the second end pour. Be sure to tape around
sates for this drawback. There side might be too dry to create a the grab loop to prevent the
have been several drownings good bond. To eliminate this resin from running out. It’s also
and near-drownings where the possibility, paint the seam area a good idea to tape the seam at
paddler hit an immovable ob- with fresh resin just before the ends of the boat. This will
struction, slid forward into the clamping the hull and deck prevent the resin from leaking
bow, and was locked in by the together. To go back a step, it’s out in case of an imperfect seal.
seat. Last summer a Colorado very important to seam your

paddler rammed a rock, slid boat when it’s still slightly tacky I’d like to suggest that you don’t
forward, and went tumbling to insure a good bond. This may try to squeegee too much resin
helplessly down the Slaughter- mean you’ll be seaming at 4:00 out of your boat. | helped a
house section of the Roaring a.m., but do it. You’ll wish you friend build her first boat, and at
Fork River. Imagine his had if you end up with 20 gallons the time | didn’t think it was
thoughts before his boat broke of 35-degree Kettle River water possible to scrape out too much
up and released him. A pillar in your kayak next April. resin. We ended up with a light-

weight kayak that didn’t leak,
but was very abrasive. Mary had
to wear black pantyhose all
summer to hide her bruises.

about 15 inches long in the stern
would add strength where it is
needed most and would not
interfere with conventional air

Some of the late-design kayaks
have very pointed ends that
complicate the seaming opera-

bags tion. | place a small 3-layer

; bias-cut patch in the ends and Don’t be lazy when you’re laying
Many paddlers have been position them with a sharpened up your boat. It’s not enough to
adding an outside seam to their stick. It also helps to taper the simply wet out the cloth. Work it
whitewater boats. | think that end of your seam tape to better into the fibers thoroughly;
this is usually overkill. | know of conform to the shape of the boat. Squeegee a little more than you
several boats with a standard 3- With these extremely pointed think is necessary. It might add
layer seam on the inside plus 2 ends, it’s almost a necessity to an hour’s work, but you’ll have a
or 3 additional on the outside. use end pours. Keep them as much stronger laminate.
This creates a dramatic flex- small as possible—no more than K : .

é ayaks have been built entirel
ibility differential, as there could 2 to 2 1/2 inches. End pours ee ae SERGE but it’s y
be as many as 10 or 11 layers of greatly simplify the installation : :
: ; f : tremendous chore and simply

cloth at the seam line. Certainly, of grab loops: simply drill a hole , .

é A can’t be done with the necessary
that many layers of cloth won’t 1 1/2 inches from the end and care and thoroughness. I’ve
flex, ales ey ae apie the the pte a Some of raver built with fawer than three
seam ends, and likely crack or e new boats have grooves on people, and have had as many as
blow the seam. If | were to use the deck at the bow and stern P . ; .

isid Id hich deat d to all six, which is not excessive. If
an outside seam, | would use a which are designed to allow a you have more than three, detail
layer of nylon and one layer of slalom racer to tape the grab : : P
: ee : one as the resin mixer-cloth
3-inch seam tape on the inside, loop flush with the deck to ’
d A feninate 4h ibili f th handler. Check each _ other’s
and one nylon p us 2-inch seam eliminate t e possibility of the work: be sure that the character
tape on the outside. Careful loop touching a gate. Normally, opposite you is carefully
seaming is very important. For boats with these grooves have squeegeeing right up to the
\ an inside seam, | suggest using the grab loops coming out of the seer [ints
a layer of 2-inch seam tape, a top of the deck. Charley .
layer of bias-cut nylon, and a Walbridge states that if you do Tips On Building Whitewater Boats
layer of 3-inch seam tape. For this, you will have to pop your . ; ;
neatness, cut the nylon just boat, install the loops, and seam will be continued in
the October Hut.

HUT PAGE F SEPTEMBER 1976

Articles (5) · Summaries (5)

Generated issue overview: September 1976 issue of HUT!, the Minnesota Canoe Association magazine. The OCR includes an editor’s note, July board minutes, an announcement about a planned canoe-building book, a book review, and a two-page article on building whitewater boats, alongside event listings, advertisements, and other non-article material.

Generated summaries are descriptions, not original captured text. Page-range text shows complete scan pages and may include neighboring material.

The Editor Says

Title transcribed from original publication

Generated summary: The editor explains the Board of Directors’ decision to distribute Canoe along with HUT, discusses the resulting publication schedule and possible future dues increase, and asks members to submit material for HUT.

Open scan page 3

Read captured page 3 →

Board Meeting Minutes July 14

Title transcribed from original publication

Generated summary: Minutes report on membership processing, publication of HUT, conservation, voyageur activities, education and safety, and discussion of the canoe-building materials depot.

Open scan page 3

Read captured page 3 →

NEW BOOK PLANNING STAGES

Title transcribed from original publication

Generated summary: The MCA announces plans to begin assembling a new book on canoe design and building, describing the earlier strip-canoe-building book and newer designs and construction methods developed by association members.

Open scan page 3

Read captured page 3 →

The Complete Wilderness Paddler

Title transcribed from original publication

Generated summary: A review of James West Davidson and John Rugge’s wilderness-paddling book. The reviewer describes its practical coverage of planning, equipment, navigation, hazards, and wilderness travel, and recommends it to canoeists including those taking shorter trips.

Open scan page 4

Read captured page 4 →

Tips on Building Whitewater Boats

Title transcribed from original publication

Generated summary: Larry Johns shares recommendations for constructing whitewater kayaks, including layup choices, fiberglass and nylon, seaming, end pours, grab loops, and careful resin work. The article discusses trade-offs among weight, flexibility, strength, and safety.

Open scan page 5

Read captured pages 5–6 →